Posts: 2
Threads: 1
Joined: Feb 2008
Reputation:
0
02-13-2008, 01:50 AM
(This post was last modified: 02-13-2008, 01:56 AM by Sujatha Errapothu.)
I am trying to schedule some test sets during night time (without presence infront of the system), how do I set up QTP to connect to the Quality Center server at night and run the test set?
I am using Quality Center 9.0, QC Patch is installed was 18, QTP 9.0, add in is SAP, and the Patch I have installed was QTPSAP82P8122. Thanks.
Posts: 35
Threads: 14
Joined: Feb 2008
Reputation:
0
02-29-2008, 11:53 PM
I tried to schedule QTP scripts in QC . Basically I uploaded the scripts to QC and closed QTP . Then I used the time dependency feature of QC to setup the scheduled execution time . Then I gave the run test set command which opened the Automatic Runner window and selected Run All
This brings up the waiting mode and executed the test at the scheduled time . QC will automatically open QTP to run the script.
If this is the scenario you are looking at , I hope it helps ,
Sonia