Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Scheduled runs from QC
#1
Not Solved
Hi,
I use QTP_8.2 and QC_9.0; how can I set launch time from QC?
In Test Lab / Execution Flow I have right clicked the test and chosen Test Run Schedule, setting Time Dependency... but at the indicated time the script has not been launched... which other setting must I modify?
Thanks in advance
Reply
#2
Not Solved
Hi,
any suggestion about scheduling? I set "Planned Exec Date" and "Planned Exec Time" on Quality Center but QTP doesn't start automatically.
Thanks
Reply
#3
Not Solved
Hi,
does somebody know the RunTestSet.exe utility? By it now I am able to schedule launchs (indipendently by setting Quality Center Time Dependency), but I have 2 questions:
1. If my test set has more than 1 test name, and I want to schedule only 1 of these test names, which parameter of RunTestSet must I schedule? (if it's possible to do it..)
2. When RunTestSet is started, how can I interrupt it? closing shell, howewer tests go on...

Thanks
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  QTP runs slow when scheduled through a Virtual Machine BajaJeff 3 5,376 06-11-2013, 02:45 AM
Last Post: Ankur
Rolleyes How can we run QTP on virtual machine at scheduled time through VB script. ritugoyal 13 22,760 11-23-2012, 11:03 AM
Last Post: vinod123
  QTP runs action More than once uma87 5 8,696 03-26-2012, 07:07 PM
Last Post: sshukla12
  Issue with Oracle Application 10g testing(runs on JRE 1.5) thru QTP 9.5 Sarada 0 2,873 07-16-2008, 10:39 PM
Last Post: Sarada

Forum Jump:


Users browsing this thread: 1 Guest(s)